C.R.E. No. 24.
Kowloon Canton Railway.
BRITISH SECTION
ESTIMATE.
Main Head Bridges
Sub. Head Work DESCRIPTION. Quantity Rate Unit AMOUNT. One 15' Arch Chain 16:495 Excavation in foundation. 000 $13.100 $ Timbering and Pumping 10 Concrete in foundation and over Arch. 150 Masonry in Footings 354 40/- Superstructure. Arch. 400 Coping. 40/- 2/0.It. Dry stone behind Abut. 350 Total $15353 Grand Total $1555.50 Contingencies 10% $17110.30C.R.E. No. 5382.
i
20
IS
Yewlief note noolwosɑ
TAUA/
tic T
900X
00
OPA
00
8
008
00
800.I
Ass
00 006,A
00 000,8
00
08
BEC, I
08
SB0,ÞI
MOITOSE
HEITIRA
3TAMIT23
C.R.E. No. 24.
kowloon Canton Railway.
BRITISH SECTION
让
99
ESTIMATE.
.asybira
boott nisl
Main Head Bridgas
·A>.OK TonÈM
brett duë
Miner No.*.
Sub. Head
Þ.0% #gbi¬d tɔ aduda neowtai dɔTA 100 9:0 ACW
Work One 15' Arch Chain 16:495
495 C.RE. No.5382.
AMOUNT.
DESCRIPTION.
Rate. Unit.
juantity,
$
Cts.
.abmsɔt at noitavnox 000
.zatqanq bxa getresmit maji
.abmwot ni ateromoo
088,$
.agnitooT ni TinonaM)
(autounjan@gwƐ ni vinɔask)
000 Izoavation in founda.
Timbering and Pumping - tem
10
13.100
150 Concrete ia founds and over Aroh.
00 Masonry in Footings
354
40/-
000,"
Superstructure.
*
.asdota si vinoesM 000.*
400
體
Arch.
Coping.
40/-
2/ 0.It.
20.It
આવે આ સુધ
100
500
00.
00.
4585
00.
00.
4440
00.
2200
00.
00.
,500 Drvatone behind Abuta.
10,
350 00.
WakuT
15353
00.
Total
91 zciznignita00
Yol ban)
Grand Total
1555 50.
Contingencies 10%
$17110
30.